Sustainability with Style

Berlin EUREF Campus grows - with fischer/BWM facade systems

Sustainability with Style
More than 150 companies and research institutions with over 5,000 employees are primarily engaged with the topics of energy, mobility, and sustainability on the EUREF Campus in Berlin-Schöneberg. Solutions for the energy transition are not only developed but also actively demonstrated: since 2014, the campus has been meeting the CO2 climate targets for the year 2045, among other things through climate-neutral energy supply, an intelligent energy network, and energy-efficient buildings.
Image: André Baschlakow, Berlin

Project Profile

Architect
EUREF Consulting Company
Client
WOLFF & MÜLLER Group
Total area
18,000 m²
Construction time
2018-2022
Location
Berlin- Schöneberg
From 2018 to 2020, the house 23-24 was built on the 5.5-hectare urban quarter under the ownership of EUREF AG (Berlin). The responsible architect and client representative was EUREF Consulting Gesellschaft von Architekten und Ingenieuren mbH (Berlin). The general contractor commissioned was the WOLFF & MÜLLER Group headquartered in Stuttgart. The new building has a total area of around 18,000 square meters. Of this, GASAG AG, one of the leading energy service providers in the Berlin-Brandenburg region, uses about two-thirds as its new headquarters. The new tenant on the EUREF campus focuses its range of services for gas, electricity, and heat supply primarily on renewable energies and efficient technologies. Also pioneering is the sustainable, ventilated curtain wall facade of the new GASAG AG headquarters. Regarding this, Johannes Tücks, Board Member of EUREF AG and Chief Architect of the EUREF Campus Berlin and Düsseldorf, said: “Sustainable architecture must be considered in the details throughout the entire chain from production, durability, to dismantling and recycling! Here, as architects, we rely on partners who develop and offer convincing solutions for us.”
Image: André Baschlakow, Berlin
This also includes fischer BWM fastening and substructure solutions, which securely anchor the futuristic aluminum cladding of the modern building envelope to the supporting structure. On a facade area of a total of 5,000 m², panels made of Novelis FF2® colored aluminum with a thickness of 2 mm in various shades of gray were installed during the execution period from 2019 to 2020. The advantages of the material lie in the diverse design possibilities as well as in its functionality. The FF2® panels impress with color and gloss retention, non-combustibility (A1), ease of installation, and cost-effectiveness. The material and color effect are very durable, and the maintenance effort during building operation is low. As a consultant for the appropriate facade cladding, W. Hartmann & Co. (GmbH & Co. KG), headquartered in Oststeinbek, was involved, a system house for aluminum. "The focus of the architect and client was particularly on sustainability and cost-effectiveness with demanding design," says Roman Meinhardt, who is responsible for architect consulting at W. Hartmann & Co. (GmbH & Co. KG). "Our facade cladding is aligned with these topics, and we can provide the corresponding information."
Image: André Baschlakow, Berlin
For the anchoring of the aluminum panels, the fischer BWM aluminum substructure ATK 100 ZeLa was installed vertically as the base substructure. The system enables thermal decoupling in favor of increased energy efficiency and sustainability. The passivhaus-certified ZeLa holder received the certificate "Passivhaus suitable component" from the Passivhaus Institute as an independent certification body. The certificate includes all key values (point thermal bridge loss coefficients) and documents the unique position of the substructure compared to conventional, market-standard wall constructions. The horizontal hat profile 601 was attached to the ATK 100 ZeLa base substructure. The facade installers then fixed a vertically oriented hat profile, specially developed for the project, as the third layer of the substructure. This special construction allowed the vertical surfaces and pilasters made of aluminum to be securely anchored. Rivets were used to fasten the facade panels. At the parapets, the aluminum panels were riveted directly. In addition to the smooth facade panels, edge parts were also installed at the cornices, which were fastened with the Clip 107 from the ATK 100 system.
Image: André Baschlakow, Berlin
“Both our product and service offerings matched the requirements of the project. The special features of the order included delivering a customized customer solution and several, up to three-layer variants of substructure profiles to the construction site,” says the responsible fischer BWM field sales representative Michael Noack. “In addition to the suitable products, our services, with which we successfully supported our partners through various construction phases, also contributed to the successful collaboration.” Jörg Granz, the responsible project manager of the contracted facade construction company WF Bau GmbH (Magdeburg), adds: “fischer BWM supported us, among other things, with consulting and development of the special solution as well as with customer- and project-specific calculations of the facade system.” The very high degree of prefabrication of the facade system by fischer BWM also enabled particularly fast installation of the facade cladding, according to Jörg Granz. The facade builders of WF Bau GmbH (Magdeburg) installed the substructure and insulation from scaffolding. The fastening of the cladding was carried out from company-owned suspended platforms.
Image: WF Bau GmbH
Both our product and service offerings matched the requirements of the project. The special features of the order included delivering a customized customer solution and several variants of substructure profiles, up to three-layered, to the construction site.
Michael Noack (fischer BWM Field Sales Representative)
The ventilated curtain wall facade fits the sustainable overall concept of the new building. The new GASAG AG headquarters has been designed as a KfW Efficiency House 55 with a very high energy standard. This means that the primary energy demand is only 55% and the transmission heat loss is only 70% of the maximum values permitted by the Energy Saving Ordinance. Factors here include triple glazing, thermal insulation, the use of smart metering (digital electricity meters to record electricity consumption), as well as locally generated renewable energy. Not only in building operation but also in the construction process, EUREF AG and its commissioned architects placed great importance on sustainability by causing as few emissions as possible. On the ground floor, there is a showroom on the topic of the energy transition for visitors. The two-story underground car park houses, in addition to 140 car parking spaces, 70 parking spaces and charging options for electric cars, which residents can also use in the evenings and on weekends. In addition, changing rooms and showers for cyclists are connected to the garage. The roof surfaces and terraces have been greened. Visually and functionally, the facade integrates into the overall concept of buildings 23-24 on the EUREF campus, where the future topic of sustainability meets a futuristic design.